| Part No. : DD101 LONG LEAD | Alternate P/N : DD101LONGLEAD | Manufacturer : crl components inc |
| Item Name: capacitor fixed ceramic dielectr | NSN: 5910-00-678-8157 (5910006788157) | CAGE Code: 71590 |
If you require part number DD101 LONG LEAD from Crl Components Inc which is described as a Capacitor Fixed Ceramic Dielectr component ASAP Logistic Solutions is your sourcing solution. On this page, you can request a quote on part number DD101 LONG LEAD which is listed under the Federal Supply Class . To ensure that you only procure the exact item you need to be sure to note that this particular product is listed with the NSN 5910006788157 and was produced under the CAGE Code 71590. To learn more about this listing or to simply initiate the purchasing process, complete and submit the RFQ form on this page for part DD101 LONG LEAD today Within 15 minutes of receiving and reviewing a completed request based on the information you provide a member of our staff will contact you to provide a tailored solution to your comparison needs.
| NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
|---|---|---|---|---|---|---|
| 5910-00-678-8157 Item PartTypeName: CAPACITOR,FIXED,CERAMIC DIELECTR | 5910 | 006788157 | 0 | P | ||
| CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
| U | A | 0 | ||||
| Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
| DD101 LONG LEAD | 3 | 1 | C | A |
| MRC | Criteria | Characteristic |
|---|---|---|
| AAQL | BODY STYLE | W/O MTG FACILITIES,RADIAL TERMINALS |
| AARG | RELIABILITY INDICATOR | NOT ESTABLISHED |
| ABJT | TERMINAL LENGTH | 1.500 INCHES MINIMUM |
| ABPM | BODY DIAMETER | 0.290 INCHES MAXIMUM |
| ADAQ | BODY LENGTH | 0.156 INCHES MAXIMUM |
| AEBS | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO DIAMETER | 0.250 INCHES NOMINAL |
| AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
| AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE S) |
| AGAV | END ITEM IDENTIFICATION | MISSILE,AI-TO-AIR,PHOEBNIX AIM-54) TELETYPE,MODEL 28 TEST CONSOLES,MINI-SACE ENGINE,AIRCRAFT TF33-PW-102 C-135E,EC-135H/K/P) MISSILE,AIR-TO-AIR,SPARROW AIM-7) SUPPORT EQUIPMENT,MX PEACEKEEPER MISSILE SUPPORT EQUIPMENT,B |
| CQBQ | CAPACITANCE VALUE PER SECTION | 100.000 PICOFARADS SINGLE SECTION |
| CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -56.0 TO 22.0 WITHOUT VOLTAGE APPLIED SINGLE SECTION |
| CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 85.0 DEG CELSIUS MAXIMUM |
| CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 1000.0 DC SINGLE SECTION |
| CRTL | CRITICALITY CODE JUSTIFICATION | FEAT |
| CRTP | TOLERANCE RANGE PER SECTION | -10.00 TO 10.00 PERCENT SINGLE SECTION |
| CWJK | CASE MATERIAL | PLASTIC |
| CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 10000.0 MEGOHMS |
| CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
| FEAT | SPECIAL FEATURES | WEAPON SYSTEM ESSENTIAL |
| TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
If you have more than one item, you can also send us your part number list (Spreadsheet) by uploading your list here.
Upload